AZ FLAP 64(3), 199(1), 288(3), Control Road, Houston Mesa Road and Reynolds Creek

Solicitation Number: DTFH68-13-B-00011
Agency: Department of Transportation
Office: Federal Highway Administration (FHWA)
Location: Central Federal Lands Highway Division
  • Print
:
DTFH68-13-B-00011
:
Award
:
October 2, 2013
:
DTFH68-14-C-00001
:
$5,357,188.70
:
Vastco, Inc.
:
425 Industrial Drive
Chino Valley, Arizona 86323
United States
:
Added: Jul 16, 2013 5:09 pm
 

After soliciting the small business community and in consultation with the SBA, this project is going to be advertised using FULL AND OPEN COMPETITION.  It is anticipated that this project will be advertised on July 31, 2013.

Project Details: 
The project will construct bridge and structure replacements for low water crossings at all four locations.  The improvements will include some roadway realignment, drainage improvements, channel improvements, concrete box culvert, minor wall structures, signing and safety improvements.  The project is comprised of one schedule as shown below.


Four separate locations:


o              Bridge replacements for 2 low water crossings on Houston Mesa Road (County 64) near Payson, AZ.  One of these locations takes the roadway off the original alignment and removes a switchback to span the channel. 


o              One Bridge replacement for a low water crossing on Control Road (County 199), near Payson, AZ


o              One Box Culvert replacement for a low water crossing on Reynolds Creek (SR 288) near Globe, AZ


Significant quantities include 3,800 tons of Roadway Aggregate, 1,700 tons of Hot Asphalt Concrete Pavement, 154,500 LB of Reinforcing Steel, 159,500 LB of Reinforcing Steel (Epoxy), 19,300 YD of Embankment and 10,950 SY of Topsoil.  This also includes roadway signing, striping and 1,030 LF of Guardrail, approximately 285 SY of Rockery and 85 CY of Gabions.


Weather Limitations for Surface Treatments - April 15, 2014 to October 2014.

Please consult the list of document viewers if you cannot open a file.

Amendment 1

Type:
Mod/Amendment
Posted Date:
July 25, 2013
Description: Amendment A002 makes changes to sections 107 and 157, changes associated with the SWPPP and monitoring requirements. No extension due to this amendment.

Solicitation 1

Type:
Solicitation
Posted Date:
August 8, 2013
Description: This file is the Invitation for Bid. TO DOWNLOAD PLANS, amendments, Q&A, Geotechnical/Hydraulic reports, and other information GO TO: http://www.cflhd.gov/contracting/construction/AdvertisedProjects.cfm

Amendment 2

Type:
Mod/Amendment
Posted Date:
August 22, 2013
Description: Amendment A001 for AZ FLAP 64(3), 199(1), 288(3). Please DISREGARD the amendment for Chester Warner Valley, it was erroneously posted to this site and cannot be removed.

Please check back to http://www.cflhd.gov/contracting/construction/AdvertisedProjects.cfm before sending in your bid for updates to the Q&A file, Amendments, and other information.
:
12300 West Dakota Avenue
Lakewood, Colorado 80228
:
Payson, Arizona
Payson, Arizona 85541
United States
:
Jeremiah Rogers
Phone: 7209633090
:
Jeremiah Rogers
Phone: 7209633090