CA FLAP 312(2), Chester Warner Valley Road

Solicitation Number: DTFH68-13-B-00009
Agency: Department of Transportation
Office: Federal Highway Administration (FHWA)
Location: Central Federal Lands Highway Division
  • Print
:
DTFH68-13-B-00009
:
Award
:
August 8, 2013
:
DTFH68-13-C-00024
:
$2,453,913.00
:
Dig It Construction, Inc.
:
803 Lorraine Drive
Chester, CA 96020
Chester, California 96020
United States
:
Added: Jun 10, 2013 10:00 am
THIS PROJECT HAS BEEN DETERMINED, IN ASSOCIATION WITH THE SBA, TO BE A HUBZONE SET-ASIDE. 

The Chester Warner Valley Road project is located in Plumas County on California Forest Highway (FH) 169, otherwise known as Old Red Bluff Road (Plumas County Road 312), off near Chester, CA. This project is the second phase of construction, and will provide resurfacing, restoration, and rehabilitation to 4.8 miles of roadway between the country road intersections of Juniper Lake Road and Warner Valley Road to the east, and the intersection of Warner Valley Road and Old Red Bluff Road to the west.  Work will be suspended for approximately 3700 feet through the phase (1) project, which realigned a segment of roadway and constructed a new bridge over Warner Creek.
 

The major work elements include pulverizing the existing road to a depth of 6", subexcavation, and a 3" asphalt surfacing.  Due to the elevation of the project, snow melt typically occurs in late Spring, and snow falls in late Fall, thus controlling commencement and termination of construction operations.  Temperature dependent work items such as asphalt paving and pavement marking must be completed in dry conditions, for which the duration is also limited.


The proposed project is for restoration, resurfacing, and rehabilitation of the existing roadway including subexcavation, pulverization, aggregate base, asphalt pavement, and drainage improvements.  Significant quantities include:


Line Item                                 Unit                   Est. Qty                           


Subexcavation                  CUYD                    5,400                                  


Pulverizing, 6-inch depth    CUYD                       65,500                                


Roadway Aggregate           TON                        15,000                           


Hot Asphalt Conc Pavmt     TON                        11,500      

Prime Coat                            SQYD                    68,500                                 

Conc Headwall (60-in pipe) EACH                       2                                


Pipe Culverts  (var.)           LNFT                          652                                   


It is anticipated that this project will be advertised in June of 2013 with construction beginning in July and ending in November, 2013.  The contracting range for this project is between $4 million and $5 million.

Please consult the list of document viewers if you cannot open a file.

Solicitation 1

Type:
Solicitation
Posted Date:
June 27, 2013
Description: The Invitation for Bid (IFB) for the HUBZone Certified Small Business Set-A-Aside. To download the PLANS, available reports, view the questions & answers for the project, and a plan holders list please visit: http://www.cflhd.gov/contracting/construction/AdvertisedProjects.cfm

Amendment 1

Type:
Mod/Amendment
Posted Date:
July 24, 2013
Description: Amendment A001: Extends bid opening until July 31, 2013. Adds fertilizer/seed specifications.
:
12300 West Dakota Avenue
Lakewood, Colorado 80228
:
Chester, California 96020
United States
:
Jeremiah Rogers
Phone: 7209633090
:
Jason J Longshore
Phone: 7209633090