Accessibility Information

Users of assistive technologies such as screen readers should use the following link to activate Accessibility Mode before continuing: Learn more and Activate accessibility mode.

NV PFH 11-1(5) Kyle & Lee Canyon Roads

Solicitation Number: DTFH68-13-B-00008
Agency: Department of Transportation
Office: Federal Highway Administration (FHWA)
Location: Central Federal Lands Highway Division
  • Print
:
DTFH68-13-B-00008
:
Award
:
August 26, 2013
:
DTFH68-13-C-00025
:
$13,264,077
:
Las Vegas Paving Inc
:
Added: Jun 04, 2013 5:18 pm
Location: Nevada Forest Highway (FH) 11 and 20 are located in Clark County in southern Nevada near Las Vegas. The FH11 route is also designated as State Route 157 (SR-157) and is also known as the Kyle Canyon Road. The FH 20 route is also designated as State Route 156 (SR-156) and is also known as the Lee Canyon Road The Kyle Canyon Road begins at the west end of the route near Cathedral Rock Picnic Area and proceeds easterly 21.25 miles on SR-157 to a junction with US-95 northwest of Las Vegas. This project is between milepost 3.6 to 21.25. The Lee Canyon Road starts at the Las Vegas Ski and Snowboard Resort and proceeds easterly 17.5 miles to SR-156 to the junction with US-95 northwest of Las Vegas. This project is at milepost 1.5.

Significant items and quantities: The project will involve three sections of work. The first section is the full reconstruction of the Kyle Canyon Roadway at milepost 4.4 to 5.2 including two roundabouts and a median. The second section involves the construction of a multi-use shoulder from milepost 3.6 to 21.25 (Deer Creek Highway to US-95). The third section involves the construction of a roundabout on Lee Canyon Road at milepost 1.5 (Foxtail and Old Mill facilities).


Work will include excavation, drainage, asphalt paving, concrete work, waterline, survey, erosion control, permanent and temporary traffic control, and revegetation. Major approximate quantities include:
- 158,000 cubic yards of Excavation
- 95,000 tons of Aggregate Base
- 27,000 tons of HACP Pavement
- 14,000 ton of Open Graded Friction Course
- 7,500 square yards of Reinforced Rigid Concrete Pavement
- 900 linear feet of Culverts
- 12,000 linear feet of Curb and Gutter
- 6,700 linear feet of PVC Waterline, 2 inch


Work along this route will take place within environmentally sensitive areas and will require interactions with the Forest Service (FS), Nevada Department of Transportation (NDOT), and the travelling public. Traffic control during construction will be very important and will be coordinated with FHWA and NDOT. The FS will also be constructing the Middle Kyle Complex Visitor's Center and the Foxtail/Old Mill recreation sites adjacent to this project during this time period. Close coordination with contractor's from those projects will be necessary.


Project will be bid with A+B bidding with a range of 300 to 400 days.


Invitation for bid will be posted on or about June 10, 2013.

This will be advertised on a unrestricted full and open basis.

The anticipated cost range is $15,000,000 to $20,000,000.

Please consult the list of document viewers if you cannot open a file.

Solicitation 1

Type:
Solicitation
Posted Date:
July 3, 2013
Description: NV PFH 11-1(5) Kyle & Lee Canyon Roads

Amendment 1

Type:
Mod/Amendment
Posted Date:
July 18, 2013
AmendA001.pdf (399.90 Kb)
Description: Extension of Bid Opening

Questions and Answers

Type:
Other (Draft RFPs/RFIs, Responses to Questions, etc..)
Label:
Questions and Answers
Posted Date:
July 18, 2013
Description: Questions and Answers_7.18.13

Additional Question and Answers_7.23.13

Type:
Other (Draft RFPs/RFIs, Responses to Questions, etc..)
Label:
Additional Question and Answers_7.23.13
Posted Date:
July 24, 2013
Description: Questions and Answers_7.23.13

Question and Answers_7.30.13

Type:
Other (Draft RFPs/RFIs, Responses to Questions, etc..)
Label:
Question and Answers_7.30.13
Posted Date:
July 30, 2013
Description: 7.30.13 Questions and Answers

Amendment 2

Type:
Mod/Amendment
Posted Date:
July 30, 2013
AmendA002.pdf (2,123.29 Kb)
Description: Amendment 0002_Bid Schedule Change_Changes to Plans to Reflect Bid Schedule Changes

Questions and Answers

Type:
Other (Draft RFPs/RFIs, Responses to Questions, etc..)
Label:
Questions and Answers
Posted Date:
August 5, 2013
Description: Questions and Answers 8.1.13
:
12300 West Dakota Avenue
Lakewood, Colorado 80228
:
Jason J Longshore
Phone: 7209633354