Accessibility Information

Users of assistive technologies such as screen readers should use the following link to activate Accessibility Mode before continuing: Learn more and Activate accessibility mode.

PATCH BRIDGE REMOVAL

Solicitation Number: AG-04GG-S-08-0034
Agency: Department of Agriculture
Office: Forest Service
Location: R-6 Central Oregon Acquisition, Deschutes NF
  • Print
:
AG-04GG-S-08-0034
:
Award
:
September 8, 2008
:
AG-04GG-C-08-0043
:
$60,761.84
:
TOTAL ALL ITEMS
:
1-A CONSTRUCTION & FIRE
:
31156 Follett Lane
Hermiston, Oregon 97838
United States
:
Added: Jul 29, 2008 5:29 pm
The General Patch Bridge has failed and needs to be removed. The bridge piers are severely rotten and should not be used for stability during the removal of the bridge. The work consists of tearing down the existing superstructure, the entire substructure, approach fills, restoring the flood plain, constructing fish structures, obliterating roads and constructing berms. Performance Time: This project is under a strict time frame. The work is to be done during October 1, 2008 to November 30th, 2008, while the in water work period is October 1st, 2008 November 1st, 2008.



Location of Project: The project is on the Deschutes National Forest and is located approximately 30 miles south of Bend on county road 42. Head south on HWY 97 from Bend, turn right on South Century Drive, continuing driving on South Century Drive (SCD). At the junction of CR-40 and SCD turn left on SCD, continue on SCD until the intersection of Huntington Rd. and SCD, turn right on SCD (CR-42). Follow South Century drive for approximately 2 miles until FS-RD 4200205. Turn right on FS-RD 4200205, and drive to the end of the road which is the beginning of the project location. The project may be located through the Big River Campground, and Bonanza rd. The legal location for the project is T20S-R10E-SEC26.

Costs:



The governments cost is estimated between $50,000 - $100,000.



The solicitation is estimated to be uploaded/issued in FEDBIZOPS on August 13, 2008 with quotes due 4:30 pm, September 2, 2008.
Added: Sep 08, 2008 12:38 pm
Not Applicable
Please consult the list of document viewers if you cannot open a file.

Solicitation 1

Type:
Solicitation
Posted Date:
August 14, 2008
Description: OFFERORS RETURN PACKAGE
Description: OFFERORS RETURN PACKAGE - CONTRACTOR PERFORMANCE DATA SHEET
Description: SOLICITATION
Description: Section J - Attachment: Specification List & Supplemental Specifications
Project Drawings.pdf (3,559.66 Kb)
Description: Section J - Attachment: Project Drawings
Description: Section J - Attachment: Fire Protection & Suppression
Description: Section J - Attachment: Fire Communication
Description: Section J - Attachment: Davis Bacon Wage Determination
Description: Section J - Contractors Performance Data Sheet
Description: Section J - Attachment: Payment Bond Form SF-25A
:
1001 SW Emkay Drive
Bend, Oregon 97702
:
Deschutes National Forest
Bend, Oregon 97702
United States
:
Maria Gonzalez,
Contracting Officer
Phone: (541) 383-5547
Fax: (541) 383-5544
:
Juanita D Johnson,
Procurement Technician
Phone: (541) 383-5543
Fax: (541) 383-5544